Watkins were asked to work on an existing boiler room which had been left in a poor condition by our clients previous M&E contractor. The work involved carrying out the internal repairs to boilers, replacing the boiler header pipework, carrying out the service of boilers, pressurisation unit, pumps, controls and cold water booster set.
Watkins also modified the internal gas supply pipework to meet current regulations, serviced HIUs and ventilation within dwellings and replaced various defective internal parts as required.
The LTHW system was chemically flushed and dosed, with samples and analysis being carried out upon completion.
We have continued with an annual PPM agreement on the development maintaining the plant and water quality.