Project case study Key Information Client:Fairview New Homes Location:Islington, London Share Watkins are leading the way to Net Zero Networks ✔️We are proud to have been Fairview New Homes nominated M&P contractor for the North Sevens project. The heat network supplying the 118-property high-rise scheme,...

Project case study Key Information Client: L&Q Location: South Grove, London Share MEP fit out to 518 apartments, infrastructure MEP services to communal areas and residents concierge services. The Solution Installation of Energy Centre incorporating gas boilers and combined heat and power (CHP) plant, distribution of heating, boosted cold...

Project case study Full Plumbing Package Key Information Client: Ward Homes Location: Bexley Share Tower Hill in Bexley was Ward Homes (Barratt) flagship scheme in West Kent. A collection of over 100 2,3 and 4-bedroom houses. Watkins provided full plumbing package on this fast track development ensuring client CML’s...

Project case study Key Information Client: Barratt Homes Location: Aylesham, Kent Share Watkins provided plumbing and gas installations for one of the largest housing projects in East Kent. Aylesham village is development of one, four and five bed homes finished to a high specification. Watkins completed Phase 1...

Project case study Plumbing, gas and water services Key Information Client: Lovell Homes Location: Essex Share Watkins provided plumbing, gas and water services for 125 houses in the Lymington Mews development, Dagenham. Works included solar thermal panels. See related projects ...

Project case study Student Accommodation Key Information Client: Epson London Location: Epsom Share Watkins provided a full MEP design and build package to this Student Accommodation block comprising of 99 rooms within 14 student clusters. The electrical fit-out included power, lighting, lift supply, security, door entry, emergency lighting...

Project case study Key Information Client: Westfield Europe Limited Location: White City, London Share This project contains 89 Social housing apartments with 2 or 3 bedrooms over 15 floors. Full distribution of statutory suppliesHyperoptic distributionIntegrated Reception systemsFire alarm integrated with the automatic Opening vent smoke clearance and environmental systemsHigh...

Project case study Key Information Client: Mount Anvil Location: Excel, South London Share This project contains 105 properties of mixed tenure within a 20 storey building close to the Excel Centre in South London. Design Completion of MEP services design from stage 4 and subsequent full MEP installation to...

Project case study Key Information Client: Rydon Construction Location: Islington, North London Share This project involved the regeneration of the Packington Estate in Islington North London where we have worked closely with Rydon Construction / Hyde Housing and their associated consultants and architects. Originally some 8 blocks...

Project case study Key Information Client: Bellway New Homes Location: Poplar Share Lansbury Square is a contemporary development of new homes in Poplar, east London. Watkins provided full mechanical and plumbing fit-out to 259 flats. Due to the resources available to Watkins we was able to respond...

Project case study Key Information Client: Linden Homes Location: Mile End, London Share Watkins providing Plumbing fitout for the redevelopment of the St Clements Hospital. We provided MVHR ventilation, heating, hot water, soils, RWP and satiaryware for 1, 2 & 3 bedroom apartments. Working in multi-phase new...

Project case study Key Information Client: Ballymore Location: Canary Wharf Share Baltimore Wharf is a flagship project in the heart of the London Docklands. 700 luxury and affordable apartments with district heating serving a mixture of specialist radiators and trench heating. Boosted water supplies to all units including...

Project case study Key Information Client: Bellway New homes Location: Poplar Share Our relationship with Bellway has grown significantly over the last 5 years covering multiple sites in the South of England including this flagship project that overlooks Canary wharf in the East of London comprising 300+...

Project case study Key Information Client: Canterbury Christchurch University Location: Kent Share Packaged plant room was built off site in a workshop with the boilers and pumps being sent to the workshop and the complete plant room framework, pipework, etc all being fabricated offsite then distributed to...

Project case study Key Information Client: Telford Homes Location: Dalston Junction Share Design coordination of commercial offices including pumps, pressurisation units and vessels, plate heat exchangers, Mitsubishi air conditioning, ventilation, air handling units, cold water booster set, cold water storage tanks, BMS controls and panels water treatment,...

Project case study Key Information Client: Bellway Homes Location: Deptford, London Share Kent Wharf is a vibrant development of new homes in Deptford, which consists of 1, 2 and 3-bedroom apartments set in landscaped communal gardens. Watkins provided the fit-out of 143 Units in three blocks served...

Project case study Key Information Client: Mount Anvil / Y&Y Management Location: Hammersmith, London Share Queen’s Wharf is a stunning new development in Hammersmith, London W6, offering 165 studio, 1, 2, and 3 bedroom residences, by Mount Anvil and FABRICA. The apartments at Queen’s Wharf form the...