Project case study Key Information Client: The King's School Location: Canterbury, Kent Share This is a Watkins FM Solutions Special project of a heritage site which has roots dating back to 597 AD, and was once again refounded in 1541. To help modernise the school...

Project case study Key Information Client: Sacred Gold Location: Covent Garden, London Share Watkins are pleased to confirm the completion of the air conditioning and ventilation installation within the new Sacred Gold store right in the heart of Covent Garden Market.Sacred Gold are London’s premium...

Project case study Key Information Client: Ruskin Park House Location: Denmark Hill, London Share Watkins FM Solutions are proud to continue the relationship with Ruskin Park House, undertaking planned preventative maintenance to the energy centre, which provides heating to 240 residences.Watkins also regularly carry out...

Project case study Key Information In association with Breem Construction Location: Barham, Canterbury Share Watkins FM Solutions are proud to announce the completion of the above project with Breem Construction. Three specialist activity rooms at The Fifth Trust’s Barham Skills Centre in the quiet Kent countryside...

Project case study Key Information In association with Jenner Contractors Ltd and Orbit Housing Location: Ashford, Kent Share Watkins are pleased to confirm the completion of the Charing development in association with Jenner Contractors Ltd and Orbit Housing.Independent Living Sheltered Accommodation Mechanical, air conditioning, plumbing, and...

Project case study Key Information Client: Benenden School Location: Benenden, Kent Share Watkins are pleased to confirm the completion of the Benenden School, Music block and School Hall in conjunction with Buxton Building Contractors. Watkins undertook the Mechanical and plumbing installation, including...

Project case study Key Information Client: Y&Y Management Location: Islington, London Share Residential Development totalling 29 blocks (465 homes / apartments) Watkins FM Solutions are responsible for full PPM contract helping to maintain the three plantrooms which supply the heating and hot water to all the...

Project case study Key Information Client: Pinnacle Location: London Share Explorers Wharf is located close to London’s Canary Wharf and has 187 apartments within this modern development of a variety of styles of two- and three-bedroom apartments. Watkins FM Solutions are responsible for the PPM of...

Project case study Key Information Client:Fairview New Homes Location:Islington, London Share Watkins are leading the way to Net Zero Networks ✔️We are proud to have been Fairview New Homes nominated M&P contractor for the North Sevens project. The heat network supplying the 118-property high-rise scheme,...

Project case study Key Information Client: L&Q Location: South Grove, London Share MEP fit out to 518 apartments, infrastructure MEP services to communal areas and residents concierge services. The Solution Installation of Energy Centre incorporating gas boilers and combined heat and power (CHP) plant, distribution of heating, boosted cold...

Servicing case study Key Information Client: Guildhall Museum Location: Sandwich, Kent Share Watkins Maintenance and Special Projects Division Complete Sandwich Guildhall Museum ProjectAs well as completing some of the largest residential projects in London our Special Project Division carries out specialist Mechanical and Electrical small works throughout...

Servicing case study Key Information Client:Canterbury Christ Church University Location: Canterbury, Kent Share A mix of both domestic and commercial boilers within various properties on the CCCU campus, together with servicing 40 No HIUs within student accommodation. See related projects ...

Servicing contract for 784 HIUs, within a number of buildings on the Kings Cross Development. ...

Project case study Key Information Client: UNEX Group Location: Stratford, London Share Design coordination of commercial offices including pumps, pressurisation units and vessels, plate heat exchangers, Mitsubishi air conditioning, ventilation, air handling units, cold water booster set, cold water storage tanks, BMS controls and panels water treatment,...

Project case study Key Information Client: Bellway Homes Location: Deptford, London Share Full PPM contract to the main development energy centre serving over 100 units. Servicing includes gas boilers and flue, CHP, pumps, sprinklers, pressurisation units and vessels, cold water booster set, cold water storage tanks, dry...

Project case study Key Information Client: Linden Homes / Pentland Estate Management Location: Southwark, London Share Full PPM contract to the main development energy centre serving over 80 units, and commercial space. Servicing includes gas boilers and flue, CHP, pumps, pressurisation units and vessels, cold water booster...

Project case study Key Information Client: Mount Anvil / Y&Y Management Location: Islington, London Share Full PPM contract to the main development energy centre serving over 200 units, Spa and commercial space. Servicing includes gas boilers and flue, pumps, sump pumps, fire pump sets, sprinklers, pressurisation units...

Project case study Sheltered Housing Key Information Client: Orbit Location: Ramsgate Share The complete replacement of boiler plant and equipment, including boilers, pumps, flues, pressurisation unit and controls. The works were carried out while the buildings were still occupied with temporary heating being provided. Works included a new BMS control...

Project case study – Remedial Works Key Information Client: James Andrews Residential Location: London Share Watkins were asked to work on an existing boiler room which had been left in a poor condition by our clients previous M&E contractor. The work involved carrying out the internal repairs to...

Project case study Key Information Client: Christchurch University Location: Canterbury, Kent Share The installation of new underground heating mains. This formed part of the enabling works diverting the existing campus heating mains to allow for construction of a new site access road. The existing services were extended between...