Pictured Project Above: Baths Court. Photo Source: Fairheat
Introduction
At Watkins, we have always believed that true sustainability cannot be confined to a blueprint or checked off a compliance list. As a leading MEP and FM partner, our responsibility extends far beyond the mechanical, electrical, and plumbing infrastructure we install. It lives in the long-term operational efficiency of the buildings we maintain and the ethical, environmental footprint we leave behind as a corporate business.
For us, delivering future-proofed spaces requires a dual commitment: engineering high-performance project outcomes on the ground, while actively driving robust Environmental, Social, and Governance (ESG) initiatives from the inside out.
In this article, we look at what this looks like in practice. First, we dive into the energy metrics of two of our recent key projects: the Vega Building, and Baths Court, where the FM Solutions team along with their project partners; Fairheat, Notting Hill Genesis and Elexion, take home the award of Residential Energy Project of the Year 2026 at The Energy Awards.
Our responsibility doesn’t end when the project hands over. Beyond the plant room, we are consistently auditing our own corporate impact from local community investment down to tangible, green initiatives like our recent partnership with Just One Tree.
Here is how Watkins is bridging the gap between sustainable construction and real-world environmental impact.
Optimising Heat Network Efficiency at the Vega Building

At Watkins, our commitment to providing forward-thinking solutions means delivering efficiency and tangible cost savings long after the physical construction is complete. A prime example of this in action is a recent Watkins FM Solutions special project, a collaboration with Southern Housing and FairHeat at the Vega Building. Supported by HNES (Heat Network Efficiency Scheme) capital grant funding, our teams implemented vital network efficiency improvements that have completely transformed the building’s infrastructure performance.

The real-world impact of these engineering upgrades on both the environment and the local community is best illustrated by the data. According to the recent case study from HNES, the impact on the residents and the environment is clear:
- 50% reduction in gas usage.
- 27,000kg of CO₂ saved annually.
- £438 average annual saving on resident heating and hot water bills.
Source: HNES (Heat Network Efficiency Scheme)
Meter and Billing also provided by our sister company, Watkins Energy.
Award-Winning Excellence: Why Baths Court is the 2026 Residential Energy Project of the Year.


The recent work of the Watkins FM Solutions team at Baths Court serves as another prime example of our energy efficient buildings philosophy in action, culminating in the project being named the Residential Energy Project of the Year 2026 at The Energy Awards.
In close coordination with Notting Hill Genesis, FairHeat, and Elexion, we navigated a highly complex retrofit that demanded seamless communication and meticulous engineering from start to finish. The scope of work involved a complete plant replacement and infrastructure overhaul including the following, all while keeping the building fully live and operational:
- Retrofit & plant replacement for the heating and hot water
- 32 dwellings and communal areas.
- Removal of the existing boiler plant and distribution
- Pump and pressurisation units along with new HIUs
Supported by Heat Network Efficiency Scheme (HNES) funding, the newly integrated network is now setting a remarkable new industry benchmark.
Performance data recently shared by our partners at FairHeat reveals that the network heat losses from this retrofit are actually performing better than the draft HNTAS new-build standards. Furthermore, we achieved heat losses approximately 50% lower than the existing building target of 200 W/dwelling.

This prestigious industry accolade is a true testament to what can be achieved when we lead with a partnership-first mindset, proving that Watkins doesn’t just maintain buildings; we actively optimise the future of the built environment.
ESG in Action: Driving Sustainability Beyond the Project
Our focus on sustainability does not pause when a team leaves the site. True environmental stewardship means looking inward at our own corporate footprint and finding tangible, scalable ways to give back to the planet. A core pillar of this commitment is our partnership with JUST ONE Tree, an award-winning non-profit organisation dedicated to removing CO2 from the atmosphere and reversing biodiversity loss through global reforestation.
Rather than treating corporate responsibility as a passive target, we have integrated this initiative directly into our pipeline of business growth. Moving forward, both our Watkins MEP and Watkins FM Solutions divisions are committed to funding the planting of trees for every single new contract we win. By directly tying our commercial success to global restoration, we ensure that as Watkins expands its project portfolio, our collective positive impact on the environment grows right along with it.
Conclusion
The successes at the Vega Building and Baths Court are a clear testament to what can be achieved through true collaboration. High-performance engineering and sustainable facilities management require forward-thinking partners, shared ambitions, and an unwavering commitment to data-driven results.
At Watkins, we look at the big picture. By pairing our technical expertise on-site with meaningful corporate initiatives like our JUST ONE Tree partnership, we ensure that our commercial growth translates directly into environmental progress.
We are proud to stand as a trusted, end-to-end partner for clients who want to build, maintain, and operate responsibly delivering measurable value to residents, stakeholders, and the planet alike.
Ready to optimise your next project?
Get in touch: