Christ Church Uni

Client: Christ Church Uni

Value: £1.1 MILLION

Works involved: Removal of existing campus boiler room and replace with new packaged plant room to serve campus.

plumbing

Packaged plant room was built off site in a workshop with the boilers and pumps being sent to the workshop and the complete plant room framework, pipework, etc all being fabricated offsite then distributed to site, crane lifted onto the campus and then the plant room external skin cladded, flues fitted, pipework insulated, BMS controls completed etc. Works on site involved the removal of approximately 1000mtr of existing heating and water services in existing ducts and replaced with new pre-insulated heating mains and new plastic water services. This all happened whilst the campus was to remain operational to staff throughout the summer months with water services working and be completed over the 12 week period before the students returned to site.